This attachment has a possible lead time of 3 to 4 weeks.
Please call for updated lead time - 877-611-0382 x 1133
PLEASE CALL PARTS DEPARTMAENT TO CONFIRM FREIGHT COST .
DUE TO CURRENT STEEL COST MUST CALL FOR QUOTE . EXPECT COST TO CHANGE
- Reach over or under obstructions to place heavy loads
- Set equipment on the roof or elevated decks
- Reach through narrow openings such as windows to set or pick up a load
- Load and unload trucks easier and more safely
- Reach into motor freight vans to load or unload materials and equipment
- Load, move, and handle equipment in your equipment yard
- Reach over scaffold to set stone or other heavy masonry units
- Hang trusses and laminated wood beams
- Designed for use on both straight mast and extendable reach type forklifts